Octane Enterprise Slave Node 2020.2 Crashes
Posted: Sun Mar 07, 2021 7:25 pm
Hi there,
my Slave Node is replying with the following message, when sending a C4D R.20 Renderjob via live viewer to it:
Launching net render node (10021201) with master 192.168.XX.XXX:1025
Pass '' is not initialized.
Verify if there is a pass dependency cycle.
Required Passes:
Pass '' is not initialized.
render node crashed or was stopped via CTRL-C
Started logging on 07.03.21 20:16:39
This Message is repeating a view times then the console stops with the following line:
reached the maximum number of consecutive runs of a render node (5) -> bailing out
I'm unsing 3x 2080ti on the Host System and 2x Quadro A6000 on the render node. The error occurres every time i try to send a render job.
PS: All running on Windows 10 - Latest Build, latest Updates and latest GPU driver.
my Slave Node is replying with the following message, when sending a C4D R.20 Renderjob via live viewer to it:
Launching net render node (10021201) with master 192.168.XX.XXX:1025
Pass '' is not initialized.
Verify if there is a pass dependency cycle.
Required Passes:
Pass '' is not initialized.
render node crashed or was stopped via CTRL-C
Started logging on 07.03.21 20:16:39
This Message is repeating a view times then the console stops with the following line:
reached the maximum number of consecutive runs of a render node (5) -> bailing out
I'm unsing 3x 2080ti on the Host System and 2x Quadro A6000 on the render node. The error occurres every time i try to send a render job.
PS: All running on Windows 10 - Latest Build, latest Updates and latest GPU driver.